Following the installation of more than 82.5 million meters of PVDs (Prefabricated Vertical Drains) in a vast industrial area near the city of Port Said in Egypt, Keller returns for the second phase...
Read MoreLast week, widespread flooding in the Yangtze river basin in China has left over 170 dead and millions homeless. The area has received record rainfall this year, causing the Yangtze river and its trib...
Read MoreHayward Baker Inc. (HBI) announces the acquisition of Ellington Cross, LLC, (EC) a regional geotechnical contractor that provides Earthquake Drain™ design and installation. Headquartered in Charlesto...
Read More