Seequent, The Bentley Subsurface Company's GeoStudio Remote Getting Started - August 2026 begins on Aug 5th 2026
Create a free account and view content that fits your specific interests in geotechnical engineering Learn More

On This Day | March 19

Search Events By Day
Month: Day:
2021
Fagradalsfjall erupted

Fagradalsfjall is an active tuya volcano formed in the Last Glacial Period on the Reykjanes Peninsula, around 40 kilometres (25 mi) from Reykjavík, Iceland. Fagradalsfjall is also the name for the wider volcanic system covering an area 5 kilometres (3 mi) wide and 16 kilometres (10 mi) long between the Svartsengi and Krýsuvík systems. The highest summit in this area is Langhóll at 385 m. No volcanic eruption had occurred for 815 years on the Reykjanes Peninsula until 19 March 2021 when a fissure vent appeared in Geldingadalir to the south of Fagradalsfjall mountain. The 2021 eruption was effusive and continued emitting fresh lava sporadically until 18 September 2021.

1969
Emley Moor transmitting station collapsed

Emley Moor has been a transmission site since the earliest days of commercial television in the UK. The present concrete tower is the third antenna support structure to have occupied the site. The first permanent transmitter built there was for ITV, covering much of the north of England. It had a 443 feet (135 m) lattice tower, which provided limited coverage. In 1964, in anticipation of colour PAL transmissions set to begin in 1966, the original 443-foot (135 m) lattice tower was replaced by a taller 1,265-foot (385.5 m) guyed mast. On 19 March 1969, a combination of strong winds and the weight of ice that had formed around the top of the mast and on the guy wires caused the structure to collapse.

1932
Sydney Harbour Bridge was opened

The Sydney Harbour Bridge is a steel through arch bridge in Sydney, spanning Sydney Harbour from the central business district (CBD) to the North Shore. The view of the bridge, the harbour, and the nearby Sydney Opera House is widely regarded as an iconic image of Sydney, and of Australia itself. Nicknamed "The Coathanger" because of its arch-based design, the bridge carries rail, vehicular, bicycle and pedestrian traffic. It is the eighth longest spanning-arch bridge in the world and the tallest steel arch bridge, measuring 134 m (440 ft) from top to water level. It was also the world's widest long-span bridge, at 48.8 m (160 ft) wide, until construction of the new Port Mann Bridge in Vancouver was completed in 2012.

1822
Sagrada Família construction started

The Basílica i Temple Expiatori de la Sagrada Família, shortened as the Sagrada Família, is an under construction church in the Eixample district of Barcelona, Catalonia, Spain. It is the largest unfinished Catholic church in the world. Designed by architect Antoni Gaudí, his work on Sagrada Família is part of a UNESCO World Heritage Site. On 19 March 1882, construction of the Sagrada Família began under architect Francisco de Paula del Villar. In 1883, when Villar resigned, Gaudí took over as chief architect, transforming the project with his architectural and engineering style, combining Gothic and curvilinear Art Nouveau forms.

Want to read more?

READ MORE

Norwegian tunnelling methods could reshape the Peak District tunnel case

Jul, 14, 2026 | News

A new proposal has revived the long-running idea of a road tunnel beneath the Peak District, aiming...

READ MORE

Second giant TBM begins work on India’s first undersea rail tunnel

Jul, 19, 2026 | News

A second large-diameter tunnel boring machine has started excavation on the Mumbai-Ahmedabad High-Sp...

READ MORE

BGS depth-to-bedrock model strengthens early ground risk screening

Jul, 15, 2026 | News

The British Geological Survey has released Version 8 of its Superficial Deposit Thickness Model, giv...

READ MORE

UPLIFT aims to make deep geothermal energy safer and more predictable

Jul, 21, 2026 | News

A new Horizon Europe project called UPLIFT is targeting one of the most difficult questions in renew...

READ MORE

Geotechnical Earthquake Engineering - A Berkeley Virtual Short Course Series

Jul, 28, 2026 | Event

UC Berkeley faculty does it again! The "Geotechnical Earthquake Engineering" series is offered from...

READ MORE

Going Beyond Conventional 1D Site Response Analysis in RSSeismic

Jul, 24, 2026 | Event

Join us for a comprehensive webinar session on bi-directional shaking, liquefaction modeling with ph...