Α short film was recently released by the Institution of Civil Engineers (ICE) London, celebrating the 150th anniversary of one of the world's most famous transport networks.
The ICE presents, in the film, the history of the London's Underground construction, including the introduction of the world's first computer controlled underground railway as well as future prospects, and highlights the decisive contribution of civil engineers in this challenging project. According to ICE, on January 10th 1863 the first train travelled from Farringdon to Paddington, while today there are 249 miles of track and 270 stations, servicing more than three million passengers every day.
See the film 'Engineering the London Underground' in the embedded video under ''Media'' below this article.
Source: ICE
Urbanization in large cities is constantly increasing the demand for advanced and complex metro netw...
Sea level may rise by 10 centimeters due to the presence of thick ice slabs in Greenland. A new stu...
Scientists have discovered tunnels beneath thick ice layers in Antarctica, which are comparable in h...
The new crossrail, named after Queen Elizabeth, which features a marathon of brand new tunnels benea...
Silvertown tunnel, a project that will potentially be the first in 3 decades to connect the two sid...
Large parts of the East Antarctic Ice Sheet did not retreat significantly during a time when carbon...
For decades, Antarctica’s ice surface has been mapped in remarkable detail, yet the terrain beneath...
London's Crossrail, the most significant infrastructure project currently in the U.K. aims to improv...
Geologists have discovered a massive crater beneath the ice sheet of Greenland. The crater was fo...