Excavation Dewatering in PLAXIS: An Iterative Approach to Find Pore Pressure Equilibrium for Better Stability begins on Aug 6th 2026
Dam: Failures Modes and Their Possible Solutions
Web Class Project Assignment Dam Engineering Engineering Geology Geomatics LiDAR Unmanned Aerial Systems Groundwater & Seepage Reconnaissance of Natural Disasters

Assignment prepared by Mariana Lopez-Roa in the fall 2020 semester of the CE 179 upper-level graduate Geosystems Design course in the Department of Civil and Environmental Engineering of the University of California at Berkeley.