Plaxis 2D/3D Basic Course – Online Training begins on June 22, 2026
Brightline West advances high-speed rail project with soil testing along I-15 corridor
News Railway Geotechnics Site Characterization & In-situ Testing (General)

Soil drilling and land surveys are underway near Jean to determine the best possible locations for the rail infrastructure as the project’s design phase advances.