Winner of the Going Digital Awards Structural Engineering category, WSP will take you through their winning project: Unity Place Delivered With Optimized Design By WSP Using Innovations From Bentley.
In this webinar, you can get insights from the experts at WSP as they take you through the challenges faced and the success achieved to efficiently design and construct the new headquarters for Santander Bank, consolidating four existing office buildings into a state-of-the-art facility.
WSP selected PLAXIS and RAM, simplifying design and streamlining workflows to meet the construction budget and timeline while achieving sustainability goals. The software helped:
The project sets a benchmark for sustainable design of commercial new builds.
Learn more about this innovative project.
Register for the webinar today!
Speaker: Billy Kelham, Senior Structural Engineer, WSP
Billy is a senior structural engineer who works for WSP in their London office. During the past 4 years he has been involved in the design and construction of Unity Place. Unity Place will serve as the new UK headquarters for Santander banking and be the workstation for around 5,000 employees. Bentley's products provided the tools to design over 84,000m2 of both RC and PT slabs within Unity Place. Its iterative analysis capabilities allowed for efficient design, reducing the overall carbon in the structure to a level that is ahead of the 2030 UK target for carbon produced by office new builds.
WSP used Bentley’s PLAXIS geotechnical application and Bentley’s RAM structural engineering applica...
When it comes to embankments, geotechnical engineers must often design against loading and localize...
WSP, using the automation capability of PLAXIS together with Python, found the right ground improve...
The proposed reclamation at Tuas Finger 1 is the first of the four ‘fingers’ of the new Tuas super...
Answer Ingeniería reduced time and materials by 17% and 3.7%, respectively, using Bentley's RAM Elem...
In southeast Beijing, China’s declining groundwater supplies caused water shortages for the Tongzhou...
RSPile has come a long way since its inception as a simple program called "Driven." Today, it stand...
The 90-kilometer HS2 Phase 1 rail route has approximately 25 million cubic meters of material ear...
Bentley Systems, Incorporated has announced its call for nominations for the 2021 Going Digital Awa...
Looking for more information? Fill in the form and we will contact Bentley for you. Alternatively, you can visit Bentley's website and speak with a Bentley Geotechnical Expert.