In western Bucharest, Romania, a residential building is being constructed over existing subway tunnels. The structure, which will cost an estimated EUR 2.5 million, includes nine floors and a baseme...
Read MoreWith the release of Bentley's PLAXIS 3D CONNECT Edition V20 Update 2, the meshing procedure is enhanced with the new Swept Meshing Feature. Learn more about PLAXIS CONNECT Swept meshing refers to the...
Read MoreBentley utilized PLAXIS 3D to accomplish a challenging geotechnical project in Stuttgart, Germany. A new, 14-floor building is being constructed above two fully operational underground tunnels in Stu...
Read MorePLAXIS 2D/3D latest CONNECT Edition (V20 Update 1) introduced the newly implemented Westergaard's added-mass feature to deal with the hydrodynamic effects induced by the impounded water on the respo...
Read MoreWith the new release of PLAXIS 2D CONNECT Edition V20 Update 1 (V20.01) and PLAXIS 3D CONNECT Edition V20 Update 1 (V20.01) the PLAXIS installation now comes with all PLAXIS User Defined Soil Models...
Read More