The Geopier GP3TM System uses replacement Rammed Aggregate Pier® (RAP) elements to reinforce good to poor soils, including soft to stiff clay and silt, loose to dense sand, organic silt and peat and variable, uncontrolled fill. It's the ground improvement method that started a revolution!
The RAP elements are constructed by applying direct vertical ramming energy to densely compact successive lifts of high quality crushed rock to form high stiffness engineered elements. The vertical ramming results in high density and high strength RAP elements providing superior support capacity, increased bearing pressure up to 10,000 psf and excellent settlement control.
Advantages
Watch the video to see how the Geopier GP3® system on-site and installation.
Source: Geopier
Source: Geopier
The original Geopier® system was developed in 1989 as an efficient and cost-effective Intermediate...
A shopping center in Guatemala required Geopier's GP3® system to improve soft to medium silts. ...
The uplift resistance provided by the Geopier systems eliminates the need for deep foundations or o...
Approximately 525, 30-inch-diameter Geopier GP3® elements were installed for the Ohio Health facili...
Geopier Rammed Aggregate Pier® (RAP) systems are efficient and cost effective Intermediate Foundati...
Geopier is in the process of installing piers to support 32 wind turbines in Logan County, IL. ...
Geopier's GP3® elements are being installed in Lexington, Kentucky to support a 4 to 5 story mixed-...
At Madison Farmers in South Dakota, a new grain storage bin has been constructed adjacent to two ex...
The Geopier Armorpact system is a cost effective solution for supporting buildings and structures i...
Looking for more information? Fill in the form and we will contact Geopier, a division of CMC for you.