Geopier GeoConcrete® Columns (GCCs) were installed to support a Data Storage Warehouse in Secauscus, NJ. Subsurface conditions include rubble fill over thick, compressible peat.
Geopier GeoConcrete® Columns (GCCs) were installed to support a Data Storage Warehouse in Secauscus, NJ. Subsurface conditions include rubble fill over thick, compressible peat. The GCC rigid inclusion system allowed the client to raise site grade to get out of the flood zone and expedite the construction schedule for great settlement performance and a cost-effective slab-on-grade design. Learn more about Geopier's rigid inclusions
Learn more about Geopier's rigid inclusions here
Source: Geopier
Source: Geopier
Over 700 Geopier GeoConcrete® Columns rigid inclusion elements were installed to provide settlement...
Geopier’s GeoConcrete® Column (GCC) rigid inclusion system provided significant cost savings and sc...
The 35,000 square-foot, 7-story residential building was planned at a property underlain by variabl...
Geopier, a division of CMC, recently launched their own version of MythBusters under the ASCE websi...
The use of the Geopier rigid inclusions resulted in a $600,000 cost savings for Buccini / Pollin Gr...
Geopier is using the Impact® system to mitigate liquefaction settlement in the City of Long Beach...
Geopier® used a combination of systems to support the proposed structure of a 1-story, high bay war...
Geopier is installing the Armorpact® system to provide foundation support with an increased bearing...
Approximately 350, 16-inch Geopier Impact® displacement piers were installed for the Kettering Fire...
Looking for more information? Fill in the form and we will contact Geopier, a division of CMC for you.