- Japan Lessons Learned Project Directorate: Guidance on Performing a Seismic Margin Assessment in Response to the March 2012 Request for Information Letter
- L. Regner ; A. Baxter ; J. Dougherty ; K. Manoly ; N. Chokshi ; R. Taylor
- Book Title / Journal: United States Nuclear Regulatory Commission (U.S.NRC)
- Year: 2012 , Series: JLD-ISG-2012-04
- Soil Dynamics ; Geotechnical Earthquake Engineering
- Description
- The U.S. Nuclear Regulatory Commission (NRC) staff is providing this interim staff guidance (ISG) as supplemental guidance to nuclear power reactor licensees on an acceptable method for performing a seismic margin assessment (SMA) as referred to in the March 12, 2012, NRC letter entitled, “Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident,” hereafter called the “50.54(f) letter.”
PDF |
- Assessing the historic movements within buildings - two case studies from the Jubilee Line Extension Project
- J.R. Standing ; J.B. Burland ; J.N. Franzius ; G.R. Taylor
- Year: 2002
- Underground Structures
- Description
- Geotechnical Aspects of Underground Construction in Soft Ground – Proceedings of the Third International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground – IS-Toulouse 2002
Toulouse - France
October 23-25, 2002
PDF |
- Building response to underground construction: the New City Court case history
- R. Allen ; J.R. Standing ; C. Choy ; J.B. Burland ; G.R. Taylor
- Year: 2002
- Underground Structures
- Description
- Geotechnical Aspects of Underground Construction in Soft Ground – Proceedings of the Third International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground – IS-Toulouse 2002
Toulouse - France
October 23-25, 2002
PDF |
- Building response to tunnel step-plate junction construction-the former Lloyds Bank Building, St James’s, London
- J.B. Burland ; R.J. Nyren ; S.C. Gupta ; G.R. Taylor ; M. Gras ; J.R. Standing
- Year: 2002
- Tunneling ; Settlements
- Description
- Geotechnical Aspects of Underground Construction in Soft Ground – Proceedings of the Third International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground – IS-Toulouse 2002
Toulouse - France
October 23-25, 2002
PDF |
- Assessing the historic movements within buildings - two case studies from the Jubilee Line Extension Project
- G.R. Taylor ; J.N. Franzius ; J.B. Burland ; J.R. Standing
- Underground Construction in Soft Ground Symposium (TC204) - IS TOULOUSE '02
-
- Underground Structures
PDF |
- Building response to underground construction: the New City Court case history
- G.R. Taylor ; J.B. Burland ; C. Choy ; J.R. Standing ; R. Allen
- Underground Construction in Soft Ground Symposium (TC204) - IS TOULOUSE '02
-
- Underground Structures
PDF |
- Building response to tunnel step-plate junction construction-the former Lloyds Bank Building, St James
- J.R. Standing ; M. Gras ; G.R. Taylor ; S.C. Gupta ; R.J. Nyren ; J.B. Burland
- Underground Construction in Soft Ground Symposium (TC204) - IS TOULOUSE '02
-
- Tunneling ; Instrumentation ; Settlements
PDF |
- Ground movement estimation for underground box structures: Movements at corners
- J. McCallum ; G.R. Taylor ; J. Birks ; Y.S. Hsu
- TC204 Underground Construction Conferences - IS SAO PAULO '17
-
- Settlements ; Underground Structures
PDF |