| the tunnel is 4.710m and the underwater part has a length of 1.570m. the tunnel is 4.710m and the underwater part has a length of 1.570m. (no1 on the map). The contractor was the “Joint Venture of Christiani Nielsen and Technical Company of General Construction S.A. (T.C.G.C. S.A.), now EMPEDOS S.A.”A.), now EMPEDOS S.A.” |
| a dry dock and were submerged into the exact place with dredged. Each part has a length of 134,50m and a weight dredged. Each part has a length of 134,50m and a weight of 10.000 to 15.000 tons.of 10.000 to 15.000 tons. |

| (Click to enlarge) In this photo you can see two diaphragm walls with pined beams. Those are the entrance of the dry dock. From this site the precast parts are guided to the place were they will be sink. |