| Soil Reinforcement for the Foundation of the Rion-Antirrion Bridge Piers |

| Want to be informed of updates for FREE? |
| CORPORATE SPONSORS become a sponsor |
| Storage of hollow steel pipes which are installed to the ground below the footings of the piers to reinforce the ground. The diameter of the pipes is approximately 2m and their length 20-30m. Photos provided by G. Konstantakopoulos, N. Stathopoulos, J. Simeonoglou. Texts by G. Konstantakopoulos photos taken in October 2001, available by the Geoengineer website |
| * Please refer to the site when you use this material * |
