Open pit for the cut-and-cover tunnels between the Střížkov and Prosek stations Open pit for the cut-and-cover tunnels between the Střížkov and Prosek stations. Credits: Fine Software
About the project
 
Operational section IV. C2 of the Prague Metro line C provides higher speed of public transport services for large housing developments of the North Town, especially in relation to the city center.
 
The section IV. C2 has 4.6km of tunnels ; mined tunnels make up a length of 2.36 km (mostly double-track) and contain three cut-and-cover stations, i.e. Střížkov, Prosek and Letňany. The final design developed METROPROJEKT Praha a.s. The construction operations started in May 2004 and the the line was opened to the public in May 2008. Construction lot 11 covers cut-and-cover tunnels between the Střížkov and Prosek stations. The total length of this lot is 772 m. The cut-and-cover Prosek station (construction lot 12) is 205 m long in total. The magnitude of the earthwork operations on the Operational section IV. C of the Metro line C – 2nd phase corresponds to the size of the project. About 1,138,000 m3 of spoil were transported from the open pit excavations and tunnels.
 
Read more here.
 