The International Information Center for Geotechnical Engineers

Search Criteria:




Quality Control of Augered Cast-In-Place / Continuous Flight Auger Piles
21
Feb
2017

21 February 2017 09:00

(Save to cal)

TBA





Quality Control of Augered Cast-In-Place / Continuous Flight Auger Piles

When: Tuesday, February 21, 2017

Who should attend: Geotechnical, structural and construction engineers; contractors, researchers and students interested in or having the need for quality control of Augered Cast-In-place / Continuous Flight Auger Piles (ACIP/CFA) piles.

This program corresponds to 2 Professional Development Hours. A Certificate of Participation documenting the number of hours of instruction (PDH) will be provided to those that take a short quiz at the end of the webinar. Check with your engineering board of registration for their continuing education requirements.

You will have the opportunity to learn from Mr. Wayne Dalton without having to leave your desk.

Learning Objectives:

At the conclusion of the webinar attendees will be able to: 

  • Describe the basic ACIP/CFA installation monitoring methods including manual and automatic utilizing PIR
  • Describe the basic principles of integrity testing using PIT, Single Hole Sonic Logging, and TIP methods 
  • Collect data by various methods
  • Evaluate data by various methods

You can find more information and register here.





The Geoengineer.org Corporate Sponsors: