Geoengineer.org Photo Gallery


Login
"Geoengineer.org Gallery" Earthfill - Rockfill Dams
Advanced Search
View Slideshow

"Geoengineer.org Gallery"

1. Project of ... ... 6. Compaction ... 7. Deep... 8. Concrete - ... 9. Earthfill -... 10. Geotechnica... 11. Geosynthetics 12. Harbors and... ... 31. In process

Earthfill - Rockfill Dams

Date: 03/20/2007
Size: 22 items (96 items total)
Talleghan Earth Dam, Tehran, Iran

Album: Talleghan Earth Dam, Tehran, Iran

Date: 11/28/2008
Size: 1 item
Views: 4517
A.V. Watkins Dam SOD Modification Project

Album: A.V. Watkins Dam SOD Modification Project

Date: 11/28/2008
Size: 3 items (23 items total)
Views: 4724
Piping and Internal Erosion Failure, Tunbridge Dam, Tasmania, Australia

Album: Piping and Internal Erosion Failure, Tunbridge Dam, Tasmania, Australia

Date: 11/28/2008
Size: 5 items
Views: 7211
Zarrineh Rud Dam, Iran

Album: Zarrineh Rud Dam, Iran

Date: 10/18/2007
Size: 8 items
Views: 8566
Stratos Dam, Greece

Album: Stratos Dam, Greece

Date: 07/18/2007
Size: 4 items
Views: 5016
Kremasta Dam, Greece

Album: Kremasta Dam, Greece

Date: 07/18/2007
Size: 4 items
Views: 7038
Masjed Soleyman 170 m dam, Iran

Album: Masjed Soleyman 170 m dam, Iran

Date: 06/13/2007
Size: 8 items
Views: 10369
15 Khurdad Earthfill Dam, Qom - Iran

Album: 15 Khurdad Earthfill Dam, Qom - Iran

Date: 07/16/2007
Size: 8 items (11 items total)
Views: 8761
Alaviyan Dam and Tunnels, Iran

Album: Alaviyan Dam and Tunnels, Iran

Date: 07/23/2007
Size: 5 items
Views: 6693
Barum Earthfill Dam,  Zangemar Chai near Maku town NW of Iran

Album: Barum Earthfill Dam, Zangemar Chai near Maku town NW of Iran

Date: 09/06/2007
Size: 5 items
Views: 8076
GEO-092

GEO-092

Title: Segregated Earthfill at Top and Rockfill at Bottom of Stockpile Slope.

Date: 03/20/2007
Views: 46358
GEO-093

GEO-093

Title: Earthfill and Rockfill Placed in Rock Dump Fill Lift Thickness.

Date: 03/20/2007
Views: 44198
GEO-094

GEO-094

Title: Predominantly Earthfill Waste Dump with Boulders at Downhill Toe.

Date: 03/20/2007
Views: 45696
GEO-095

GEO-095

Title: Predominantly Rockfill Waste Dump from Top to Bottom of Slope.

Date: 03/20/2007
Views: 42149
GEO-096

GEO-096

Title: Rockfill dam construction in Southern California with 50 ft (15 m) downstream raise to existing dam.

Date: 03/20/2007
Views: 36362
GEO-097

GEO-097

Title: Wetting and compacting 2 ft (0.6 m) thick loose rockfill lift with 20 ton wibratory compactor roller

Date: 03/20/2007
Views: 29889
GEO-098

GEO-098

Title: Dozer prepared test fill surface for controlled roller pass versus settlement measurements in 2 ft lift.

Date: 03/20/2007
Views: 25570
GEO-099

GEO-099

Title: Survey measurement of loose lift surface elevation in test fill.

Date: 03/20/2007
Views: 24116
GEO-100

GEO-100

Title: Test fill control points cross-marked for survey and spaced 1 roller width apart for centerline compaction.

Date: 03/20/2007
Views: 21590
GEO-101

GEO-101

Title: Test fill settlement points are remarked for survey after 2 vibratory compaction roller passes.

Date: 03/20/2007
Views: 18076
GEO-102

GEO-102

Title: Test fill surface becomes more level with each pass of the vibratory compaction roller.

Date: 03/20/2007
Views: 17602
GEO-516

GEO-516

Title: The Maco Tailings Dam, Philippines, Island of Mindanao

Date: 01/03/2008
Views: 9744
     
Page: 1