|
Album: Talleghan Earth Dam, Tehran, Iran
Date: 11/28/2008
Size: 1 item
Views: 4519
|
Album: A.V. Watkins Dam SOD Modification Project
Date: 11/28/2008
Size: 3 items
(23 items total)
Views: 4726
|
Album: Piping and Internal Erosion Failure, Tunbridge Dam, Tasmania, Australia
Date: 11/28/2008
Size: 5 items
Views: 7212
|
Album: Zarrineh Rud Dam, Iran
Date: 10/18/2007
Size: 8 items
Views: 8566
|
Album: Stratos Dam, Greece
Date: 07/18/2007
Size: 4 items
Views: 5017
|
|
Album: Kremasta Dam, Greece
Date: 07/18/2007
Size: 4 items
Views: 7040
|
Album: Masjed Soleyman 170 m dam, Iran
Date: 06/13/2007
Size: 8 items
Views: 10369
|
Album: 15 Khurdad Earthfill Dam, Qom - Iran
Date: 07/16/2007
Size: 8 items
(11 items total)
Views: 8761
|
Album: Alaviyan Dam and Tunnels, Iran
Date: 07/23/2007
Size: 5 items
Views: 6693
|
Album: Barum Earthfill Dam, Zangemar Chai near Maku town NW of Iran
Date: 09/06/2007
Size: 5 items
Views: 8076
|
|
GEO-092
Title: Segregated Earthfill at Top and Rockfill at Bottom of Stockpile Slope.
Date: 03/20/2007
Views: 46358
|
GEO-093
Title: Earthfill and Rockfill Placed in Rock Dump Fill Lift Thickness.
Date: 03/20/2007
Views: 44198
|
GEO-094
Title: Predominantly Earthfill Waste Dump with Boulders at Downhill Toe.
Date: 03/20/2007
Views: 45697
|
GEO-095
Title: Predominantly Rockfill Waste Dump from Top to Bottom of Slope.
Date: 03/20/2007
Views: 42150
|
GEO-096
Title: Rockfill dam construction in Southern California with 50 ft (15 m) downstream raise to existing dam.
Date: 03/20/2007
Views: 36362
|
|
GEO-097
Title: Wetting and compacting 2 ft (0.6 m) thick loose rockfill lift with 20 ton wibratory compactor roller
Date: 03/20/2007
Views: 29889
|
GEO-098
Title: Dozer prepared test fill surface for controlled roller pass versus settlement measurements in 2 ft lift.
Date: 03/20/2007
Views: 25570
|
GEO-099
Title: Survey measurement of loose lift surface elevation in test fill.
Date: 03/20/2007
Views: 24116
|
GEO-100
Title: Test fill control points cross-marked for survey and spaced 1 roller width apart for centerline compaction.
Date: 03/20/2007
Views: 21590
|
GEO-101
Title: Test fill settlement points are remarked for survey after 2 vibratory compaction roller passes.
Date: 03/20/2007
Views: 18077
|
|
GEO-102
Title: Test fill surface becomes more level with each pass of the vibratory compaction roller.
Date: 03/20/2007
Views: 17603
|
GEO-516
Title: The Maco Tailings Dam, Philippines, Island of Mindanao
Date: 01/03/2008
Views: 9744
|
|
|
|